Drawbridge Operation Regulation; Wishkah River, Aberdeen, WA
Official abstract: The Coast Guard is changing the operating schedule that governs the Puget Sound and Pacific railroad bridge (PS&P) across the Wishkah River, mile 0.1 in Aberdeen, WA. This rule will change the PS&P railroad bridge draw position to the fully closed-to-navigation position. Furthermore, this rule requires 24-hour notice for all drawbridge openings and a bridge operator will no longer be required to be on site.